Microsoft Project Setup

How to Setup Microsoft Project 2024 Standard (LTSC)

Microsoft Project 2024 Standard Setup Guide | How To Setup
Clear, guided installation

Set up Microsoft Project 2024 Standard with confidence.

A simple, start-to-finish guide for downloading, installing and activating Project Standard LTSC on your Windows PC.

32 & 64-bit readyPlain-English stepsActivation included
A professional preparing a project plan on a laptop in a bright home office
One guide. Every step.From a clean install to activation.
Straightforward stepsNo technical jargon
Built for Windows32-bit and 64-bit
Complete walkthroughInstall and activation
Before you start

Five minutes of prep makes the install smoother.

Save your work, check that you have your product key, and remove any older Project installation before downloading the new package.

PC

A Windows PC

Windows 10 or 11 with administrator access.

⌁

Your product key

Keep your key-delivery email within reach.

GB

Enough free space

Allow room for the download and installation.

×

Apps closed

Save your work and close open Office apps.

Important: remove an older Project installation first.

Open Windows Settings → Apps → Installed apps, find Microsoft Project and uninstall it. Restart your PC if Windows asks you to.

The complete setup guide

Four clear steps. You’ve got this.

Work through each step in order and mark it complete as you go. Your progress stays visible beside the guide.

01Prepare

Remove any existing Project installation.

Save your work and close Microsoft apps. Then uninstall any earlier version of Microsoft Project so it cannot conflict with the new installation.

  1. 1Open Windows Settings and select Apps.
  2. 2Choose Installed apps and search for Microsoft Project.
  3. 3Select Uninstall, follow the prompts, then restart if requested.
02Download

Download the Project 2024 Standard package.

Download the ZIP package to your Downloads folder. It contains both the 32-bit and 64-bit installation folders.

↓ Download installer (.zip)
File nameProject_2024_Standard_LTSC.zip32 & 64-bit included
Extracted Microsoft Project 2024 Standard installation files in Windows File Explorer
After selecting Extract All, open the extracted installation folder in File Explorer.
03Install

Extract the ZIP, then run the installer.

Right-click the downloaded ZIP file, choose Extract All and open the extracted folder. Then select the folder that matches your Windows system type.

Choose your system type

Open the 64-bit folder

Double-click the 64-bit installation folder inside the extracted package.

Run start.bat

Double-click start.bat and leave the window open until installation finishes.

04Activate

Enter your product key and verify activation.

Open Project—or another Microsoft Office app—then go to File → Account. Choose Change Product Key and enter the key from your delivery email.

01

Copy the key from your delivery email.

02

Paste it into Change Product Key.

03

Reopen the app and verify activation.

Ready to begin?

Download once, follow the steps, and get back to planning.

The Standard LTSC package includes both system types, and the guide stays here whenever you need to check the next step.

↓ Download Project 2024 Standard
Helpful answers

A few useful answers before you begin.

Quick guidance for the questions that most often come up during installation and activation.

Do I need to uninstall an older version of Project first?

Yes. Remove any existing Microsoft Project installation before you begin. Older Project files can conflict with the new LTSC installation. You do not need to remove your other Office apps unless your licence provider has told you to.

Should I choose the 32-bit or 64-bit folder?

Choose 64-bit for most modern Windows PCs. Use 32-bit only if Windows or an important add-in specifically requires it. If you are unsure, open Settings → System → About and check System type.

Where do I find my product key?

Use the product key from the key-delivery email you received with your purchase. Keep that email open on another device or copy the key before starting activation.

What if activation does not appear immediately?

Close Project, reopen it and check File → Account again. Confirm the key was entered exactly, your internet is working, and Windows has the correct date and time. Restarting can also complete pending changes.